Like every other industry, the construction industry has undergone modernization and evolutionary changes that have increased options for the execution method. Customers can now choose to go with the design bid build process, considered the more traditional approach, or the design-build route, often recognized as a modern delivery method.
But what does each method entail, and how do you choose between them? In this article, we’ll go through the definition of each process and which projects they’re best suited for, to help you make an informed decision for your next project.
Design-Build – One Team. One Process. Better Results.
Managing a commercial construction project can quickly become overwhelming when multiple companies are responsible for different parts of the job. Separate architects, engineers, contractors, and consultants often mean more meetings, more contracts, and more opportunities for communication to break down.
That’s where the design-build approach makes all the difference.
At Southwest and Midwest Design & Construction, one experienced team manages your project from the first conversation through final completion. Design, budgeting, planning, and construction all work together under one contract, giving you a single point of contact and one team that’s fully invested in your project’s success.
By bringing everyone together early, we’re able to identify challenges before construction begins, provide more accurate budgets, and make decisions that keep your project moving forward.
DESIGN-BID-BUILD
The design-bid-build process is more traditional than its counterpart and involves more than one contract. In addition, this method involves breaking down construction projects into numerous steps, starting with the design.
Owners then request bids from designers or architects to design the project. The owner’s contract with the designer is the first contract they can expect to sign during the project.
The architect/designer works directly with the owner during the design process, giving the owner more input and increased control than other delivery methods.
Once a firm is selected, the owner and the design team will create the construction documents to attract bids from construction contractors, who can then bid on the job based on the drawings. The bidding process can be one of the longest aspects of the project. This step needs to be accounted for in the project delivery date, as it can take some time for the bids to start coming in. Traditionally, the job is awarded to the lower bidder under a construction general manager.
Once a construction company’s bid is selected, the owner enters into the second contract they’ll need for the project’s actual construction. The construction general manager from the chosen company will oversee the project and may even contract out subcontractors to finish specialized parts of construction, such as plumbing.
Although the process may take longer due to the “in-progress” nature of having to take the time to request bids from two different aspects of the project – this competitive bidding process is also what drives costs down. The design-bid-build process is typically more economical than its counterpart due to companies competing for the job and forcing the bids to go down.
CONCLUSION
Overall, both methods of project delivery have their benefits and their place. For example, design-bid-builds can be great for customizations and lower costs. Still, design-builds benefit from shorter wait times and collaboration on the project, on top of there only being one contract to manage instead of two or more.
Both methods have their place; that’s why it is essential to figure out which is suitable for your next project.