City of Lethbridge Landfill Gas Control Plant

Lethbridge Landfill Gas Control Plant

SWMW was proud to support multiple facility upgrades and expansions at the City of Lethbridge Waste & Recycling Centre, delivering three specialized projects that support the city’s long-term waste diversion, recycling, and landfill operations. Together, these builds reflect SWMW’s ability to deliver highly functional industrial and municipal infrastructure tailored to specific operational needs.

Completed in 2022, the City of Lethbridge Landfill Gas Control Plant was constructed as a new facility at the Waste & Recycling Centre. SWMW acted as the General Contractor and was responsible for all aspects of the build, including civil, mechanical, and electrical work. The project included construction of an 8,600 sq. ft. fenced compound with an access road, along with installation of specialty equipment to meet the City’s specifications.

The building itself is a 1,120 sq. ft. pre-engineered steel structure that houses the landfill gas blower. A notable feature of the facility is the inclusion of explosion relief panels, reflecting the specialized requirements of the project.

Related Projects

Related Projects

Inland Screw Piling

Inland Screw Piling

DuPont building

DuPont Pioneer Research Station

Viterra Project

Viterra Tempest – Red Lintel Cleaning Facility

Triple M Housing

Triple M Housing

Lethbridge Door Systems Inc.

Lethbridge Door Systems Inc.

Monsanto Project

Monsanto

Nudura

Nudura

ITB Trucking

ITB Coaldale Expansion

Industrial building

All Class Fabrication