Nashlyn Pasture

Nashlyn Pasture

SWMW was proud to support multiple facility upgrades and expansions at the City of Lethbridge Waste & Recycling Centre, delivering three specialized projects that support the city’s long-term waste diversion, recycling, and landfill operations. Together, these builds reflect SWMW’s ability to deliver highly functional industrial and municipal infrastructure tailored to specific operational needs.

The City of Lethbridge Materials Recovery Facility was completed in 2018–2019 as a supply and erect contract. Built to support recycling sorting operations, this new facility totals 44,900 sq. ft. and includes a 40,950 sq. ft. main building with a 40-foot eave height, along with two annex structures: a 1,200 sq. ft. receiving building and a 2,970 sq. ft. office.

The pre-engineered building structures were finished with 4-inch insulated metal panels on the walls and 6-inch standing seam insulated metal panels on the roof, creating a durable enclosure suited to industrial use.

Related Projects

Related Projects

DCC Ralston Sheds Project

DCC Ralston Sheds Project

Animal Control Facility in Medicine Hat

Animal Control Facility in Medicine Hat

Chetwynd Municipal Hall

District of Chetwynd Municipal Hall

inuvik water treatment plant

Inuvik Water Treatment Plant

Patterson Armoury Underpinning

NAMPA

Nampa Civic Centre & Museum

Playground project

Irvine Community Resource Centre